Patau Patau Cooling Upgrade
104 MWgas turbine plant cooling conversion
Project Context
The Challenge
Converting the cooling system of three Frame 6B Gas Turbines (104MW plant) from water-cooled to air-cooled to address efficiency issues.
Engineering Delivery
Navsar's Technical Solution
Complete engineering study, design of Air-Cooled Heat Exchanger with PLC automation, fabrication, and remote commissioning supervision.
Verified Outcome
Business Impact
Eliminated water dependency and enhanced cooling reliability for the 104MW plant.